When PackStar was installed we ensured that it caused minimal disruption to the existing way of working. To this end, the installation was done over several weeks, section by section.
We started by getting the orders in by EDI and recoding them into PackStar, then moving on to controlling the production lines. During the next stage we implemented the bar coding of onion bins and started to record the grading and QC results. Finally we installed the part of the system that handled despatch and loading of lorries.
The bespoke nature of the system means that it’s grown over time. Periodically Stourgarden have requested more options with the most recent being to conform with the latest of their customers
initiatives being SSCC’s and ASN’s.